Appearance
Assign an external service provider and provider engineer
For outsourced work, assign an external provider that selects its engineer, or assign a provider engineer directly.
Overview
| Dispatch path | Owner | Use case |
|---|---|---|
| Two-level dispatch | Upstream dispatcher selects a provider; provider dispatcher selects an engineer | The provider chooses the specific engineer |
| Direct dispatch | Upstream dispatcher selects a provider engineer | The upstream organization already knows the engineer |
Both paths support automatic rules. At each configured node, the system evaluates rules first. Only unmatched work orders require manual assignment.
Before you begin
IMPORTANT
- Your organization has configured the connected-service process and assignment nodes.
- The upstream user has the Dispatcher role and relevant work order permissions.
- For two-level dispatch, a provider dispatcher completes the downstream assignment.
- The provider or provider engineer has an active connection and appears in the candidate list.
Procedure
Choose the path configured for your connected-service process.
Two-level dispatch: assign a provider first
Upstream dispatcher assigns the provider
- Go to Tasks > Work Orders Pending Assignment and open the outsourced work order.
- Select Assign Work Order, then select an external provider.
- Verify the provider, then select OK.

The work order enters the provider's assignment stage.
Provider dispatcher assigns a provider engineer
- Sign in to the provider portal as a provider dispatcher and open the work order.
- Select Assign Work Order.
- Select an engineer from the provider, then confirm.

Direct dispatch: assign a provider engineer
Go to Tasks > Work Orders Pending Assignment and open the outsourced work order.
In the provider engineer assignment task, select Assign Work Order.

Review each candidate and their provider, then select the engineer.
Verify the engineer, then select OK.

If a downstream engineer owns the next node, the selected engineer receives a standard work task notification.
Expected result
- In two-level dispatch, the system records the delivery partner. After downstream dispatch, it records the provider and provider engineer assignment.
- In direct dispatch, the system records the assignment and selected provider engineer.
- The work order enters the selected provider's or engineer's next process stage.
Notes
- Automatic rules work only when the process contains the corresponding assignment node.
- Only users with the Provider Dispatcher role can assign provider engineers downstream.
- Confirm whether the provider or the upstream organization selects the engineer.
- Before submitting, verify the provider, engineer, and engineer's organization.